Daimler builds second press shop at Kecskemét plant with HUF 50 bln investment
The new press shop will be built on a 23,000sqm area, and is expected to double to the plant’s existing pressing capacities.
To be equipped with the latest technologies, the new facility will make Daimler’s production more efficient and flexible not just locally but also on a global level.
To be featuring laser-supported production lines, the second press shop will rank the Kecskemét plant among the most advanced production units in the world.